Highlights

 

N544 Silver Creek Cascade Road

Random Lake . WI . 53075

920.994.9433

Village of Cascade, WI


The installation of two
NPS 100 Wind Turbines
made this the first wastewater treatment
plant in WI to be powered 100% by wind energy!

Random Lake

High School

Random Lake, WI


The installation of

an Endurance E3120

50kW Wind System

was completed in

September 2010

and offsets a

portion of the

school district’s

electric load.

NPS 100, 100kW Wind System

at Jeff-Leen Farm, WI

Owned by Ritger Law Office

Neenah, WI

11kW Gaia on

120’ Lattice Tower